I need a solution
I have a multi server backup job that backs up 5 different servers. Friday full and incrementals on Mon to Thursday.
The incremental backup job failed on one of the 5 servers, but the other 4 has been successful.
How can I rerun the incremental for the failed server without having to run the entire incremental (for the 5 servers) again or without having to run a full backup job for the failed server?